Through the stop together.

Turnarounds and stops in the process industry. A crew that plans ahead, keeps working through the stop and hands over a file that adds up afterwards. Every hour counts, and we know it.

Scroll and get to know us

What it is about

A stop is a success when the installation is running sooner than planned, without anyone hurting so much as a finger.

Twenty-four hours in the stop

The work does not stop when it gets dark.

Scroll through twenty-four hours on site. From the morning start to the night shift, the clock runs along.

06:00

Starting with the LMRA.

The crew starts with a toolbox talk and the LMRA. Work permits are ready, today's scope is known.

13:00

Work to the schedule.

Opening, dismantling, repairing and putting back together. The stop is planned by the hour, so everyone knows what has to be finished.

18:00

Handover on paper.

At the shift change everything is handed over on paper: what is done, what is still open and what to watch out for.

00:00

The night shift keeps going.

Under floodlights the work carries on, so the installation is back in operation sooner.

04:30

Ready for the next shift.

What was done during the night is ready for inspection in the morning. That way every hour of the stop counts.

Safe, even under time pressure

We work safely or we do not work.

Especially in a stop, with dozens of people on a small site and the clock ticking, safety matters most. PPE, lockout and work permits are not a delay for us but the basis.

Scroll and watch

How a stop runs

Three phases, one crew.

We are there before, during and after the stop. The same people, the same schedule.

Before the stop

Getting everything ready that can be ready.

ScopePlanningPrefab

Going through the scope, putting together work packages, ordering material and prefabricating spools. The more we do up front, the shorter the stop.

During the stop

Working through, in shifts if needed.

ShiftsDaily meetingAdjusting

A short stand-up every day: what is done, what is slipping, where is help needed. If something runs late, you hear about it the same day.

After the stop

Starting up with a file that adds up.

Pressure testReportEvaluation

Pressure tests, inspections and reports are in the system. Then we evaluate together what will make the next stop shorter.

Why Ergenc for your stop

Small enough to move fast, big enough for the whole stop.

You do not get a project organisation with ten layers, but a crew with a foreman who knows you.

One point of contact

A foreman who is on your site for the whole stop and can make decisions.

All disciplines

Mechanical, piping, construction and welding in the same crew, so no waiting for another party.

Within thirty minutes

From Hellevoetsluis to the Botlek, Europoort, Maasvlakte and Pernis. Also for that one part that turns out to be needed after all.

VCA-P and more

Access to the plants with the highest demands, with the papers to go with it.

In a stop, dozens of crews work alongside each other. VCA-Petrochemie is then not just a piece of paper but the condition for being allowed on site.

ISO 9001ISO 3834-2EN 1090VCA-Petrochemie

Frequently asked questions

Questions about shutdowns.

How far in advance should we bring you in?

The earlier the better. For a large stop preferably three months ahead, so prefab and material are ready on time.

Do you work in shifts?

Yes, in two or three shifts if the stop calls for it.

Can you also arrange the scaffolding?

We arrange scaffolding through regular partners, included in our planning.

What do you hand over after the stop?

A file with work orders, pressure tests, inspection reports and material certificates, plus an evaluation.

Stop on the schedule

When does your installation shut down?

The earlier we get involved, the shorter the stop. Even if the date is not fixed yet: put the scope in your request.

  • We read your requestTogether with the details and drawings you send along, so we know what it is about.
  • We get in touchThe way you prefer, by email or by phone, with the questions that matter.
  • Where needed, we come and take a lookOn site we see more than on a drawing. After that you get a proposal with price and planning.

Rather speak to someone right away? Call +31 181 284042 or email [email protected].

    About you
    Your company
    The job
    Which services do you need? *
    What is it about? *
    How would you like us to contact you?
    Drawings and consent

    Fields marked * are required.

    Ergenc

    Thank you, we have received your request.

    We will look at it and get in touch the way you indicated. Want to add something? Just email it to [email protected].

    Shutdowns and turnarounds in the process industry

    Ergenc carries out shutdowns and turnarounds for the process industry in the Rijnmond area: from scope and planning to execution in shifts and handover with a file. Mechanical, piping, construction and welding in one crew.

    Stops in Botlek, Europoort, Maasvlakte and Pernis

    From Hellevoetsluis we are on site within thirty minutes. Prefabrication in our own workshop makes the stop shorter, see prefabrication, mechanical and piping.

    Working safely under time pressure

    In a shutdown, safety matters more than ever. We work to VCA-Petrochemie and ISO 9001. We work safely or we do not work.

    Skip to content