Everything back in line.

Dismantling, moving, reinstalling and aligning pumps, compressors, heat exchangers, valves and fittings. With the measurement and the report included, so you know what was done.

Scroll and get to know us

What it is about

Rotating equipment is precision work. A tenth of a millimetre of alignment is the difference between twenty years and two months.

Out and back

Off the foundation, and back again.

Scroll and the pump set comes off the baseplate as a whole, and goes back again. Aligned, with the measurement included.

Pump Coupling Motor Baseplate

Beforehand

First record how it was.

Before anything comes loose we measure the alignment and mark the position, so we know where it has to go back to.

Dismantling

Pump and motor disconnected.

Lines blinded, coupling disconnected, anchors out. Pump and motor come off the foundation as a whole.

Moving

Out or to one side.

With lifting gear and a lifting plan the set goes to its new spot or safely to one side, so work can be done on the foundation.

Reinstalling

Back on the foundation.

Back on the baseplate, anchors tightened and the lines connected stress-free.

Aligning

Aligned by laser.

Pump and motor aligned with a laser system, with the measurement in the report. Then you know what was done.

What we dismantle and install

Everything that rotates, with the measurement included.

Scroll through the list, the image moves along.

PumpsDisconnecting, removing, putting back and aligning with the motor, along with the pipework around it. CompressorsDismantling for transport or a stop, reinstalling, aligning the coupling and vibration measurement after assembly. Heat exchangersPulling covers and bundle, replacing gaskets, tightening to procedure and leak testing. Valves and fittingsRemoving, swapping and putting back, with the right gaskets and tightening torque. Fans and blowersAligning to the drive, replacing bearings and putting back. Agitators and mixersDismantling and installing in closed vessels, shaft seal and alignment.

From installation to coupling

Closer and closer, down to a tenth of a millimetre.

Scroll and zoom in: from the whole installation to the machine, and from the machine to the coupling it all comes down to.

The installation

Dismantling and moving: first record how it was.

The machine

Installing: back on the foundation, with new gaskets and the right torque.

The coupling

Aligning: a tenth of a millimetre decides twenty years.

To measure is to know

What we measure before we say anything.

We do not make a call on a machine without measuring it. That way you avoid removing a pump that only needed realigning.

Vibration measurement

The first sign that something is changing.

BearingsImbalanceAlignment

A vibration measurement tells you whether it is down to a bearing, imbalance or the alignment. That decides what we do, and what we do not.

Laser alignment

Motor and machine in line.

CouplingFeetReport

After every installation we align by laser and record the values. That way the machine starts out with the best chance of a long life.

Reporting

What was done, and what needs attention next time.

BeforeAfterAdvice

Readings from before and after installation side by side, plus advice for the next round. That way you build up a history per machine.

A workshop for whatever can come out of the installation.

Whatever can come out of the installation, we bring to Hellevoetsluis: cleaning, changing gaskets, measuring and preparing for installation, without the time pressure of a running plant. In the new building, mechanical gets its own floor.

Scroll and watch

Why Ergenc

Mechanical work without guesswork.

No replacing parts on gut feeling, but measuring, knowing and then doing.

Rotating equipment on a plant calls for the right papers: VCA-Petrochemie for access, ISO 9001 for the way we record it.

ISO 9001ISO 3834-2EN 1090VCA-Petrochemie

Frequently asked questions

Questions about mechanical.

Do you work on site or in the workshop?

Both. Whatever can come out of the installation, we do in Hellevoetsluis. Whatever has to stay in place, we do on the spot.

Do you also do vibration measurements separately from a job?

Yes, also as a periodic measurement within a maintenance agreement.

Do you also work on the internals of gearboxes or pumps?

No. We dismantle, move, install and align. Internal repair work we arrange together with the manufacturer or a specialist partner.

Can you also reposition and connect the machine?

Yes, including frame, foundation, alignment and the pipework that goes with it.

Machine out or in

Which machine needs to come out or go in?

Type, make and what needs to happen is enough to get started. If it needs moving or aligning, add that too.

  • We read your requestTogether with the details and drawings you send along, so we know what it is about.
  • We get in touchThe way you prefer, by email or by phone, with the questions that matter.
  • Where needed, we come and take a lookOn site we see more than on a drawing. After that you get a proposal with price and planning.

Rather speak to someone right away? Call +31 181 284042 or email [email protected].

    About you
    Your company
    The job
    Which services do you need? *
    What is it about? *
    How would you like us to contact you?
    Drawings and consent

    Fields marked * are required.

    Ergenc

    Thank you, we have received your request.

    We will look at it and get in touch the way you indicated. Want to add something? Just email it to [email protected].

    Mechanical: dismantling and installing pumps, compressors and heat exchangers

    Ergenc dismantles and installs rotating and static equipment for the process industry: pumps, compressors, heat exchangers, valves, fittings and fans. Removing, moving, putting back and aligning, with vibration measurement and reporting.

    Mechanical in the Rijnmond area and in our own workshop

    On site in the Botlek, Europoort, Maasvlakte and Pernis, or in our workshop in Hellevoetsluis. We often combine mechanical with maintenance, piping and shutdowns.

    Certified and safe

    We work to ISO 9001 and safely to VCA-Petrochemie. To measure is to know, and that goes for us too.

    Skip to content