Safe on the plant, every day.

Maintenance, piping, construction and shutdowns on crackers, refineries and downstream units. With VCA-Petrochemie and a crew that knows the plants.

Scroll and get to know us

What it is about

On a petrochemical plant every hour of downtime counts, and so does every procedure. Both at once, that is the craft.

On the plant

Four spots where you will find us.

Scroll and the points light up one by one. Click through to the service that belongs to it.

At the columns

Piping and valves during the stop.

Prefabricating spools in Hellevoetsluis, then installing and pressure testing them on site within the days the stop lasts.

At height

Platforms and pipe racks.

Work platforms around columns and equipment, built to EN 1090 and safe to walk on from day one.

At the pumps

Mechanical: out, back in, aligned.

Disconnecting, moving, reinstalling and laser aligning pumps and compressors, with the measurement included.

In the pipe track

Maintenance that cannot wait.

Leaking flanges, worn bends and supports: repaired or replaced, welded to ISO 3834-2.

What we do there

Three things that always come back on a plant.

From daily maintenance to a three week stop.

Shutdowns

Part of the turnaround.

ShiftsPrefabFile

We plan ahead, work through in shifts and hand over with a file that is right. Every hour the plant runs earlier counts.

View shutdowns
Piping

Pipework that stays tight.

ISO 3834-2Pressure testingReport

Carbon steel, stainless steel and duplex, welded by qualified welders and inspected where the standard requires it.

View piping
Maintenance

Keeping running what runs.

PreventiveBreakdownCondition

Fixed rounds, breakdowns outside office hours and maintenance based on condition instead of the calendar.

View maintenance

Access to the plant

VCA-Petrochemie is not a formality here.

Without those papers you do not get on site. We have them, and our craftsmen work to them.

VCA-Petrochemie for the site, ISO 9001 for the organisation, ISO 3834-2 for the welding and EN 1090 for the structures.

ISO 9001ISO 3834-2EN 1090VCA-Petrochemie

Frequently asked questions

Questions about working in petrochemicals.

Are you allowed to work on every site?

With VCA-Petrochemie we get onto the plants with the highest requirements. We always follow site specific instructions.

Do you also work in a stop with shift work?

Yes. In a stop we keep going in shifts, with a foreman who is on site for the whole stop.

Can you supply prefab for our stop?

Yes, that is what we prefer. The more we make in advance, the shorter your stop becomes.

Working in petrochemicals

Tell us about your installation in petrochemicals.

Tell us which unit it is about and when the stop is planned. Then you hear what we can do and what we need for it.

  • We read your requestWith the details and drawings you send, so we know what it is about.
  • We get in touchThe way you prefer, by email or by phone, with the questions that matter.
  • Where needed, we come and lookOn site we see more than on a drawing. After that you receive a proposal with price and planning.

Rather talk to someone straight away? Call +31 181 284042 or email [email protected].

    About you
    Your company
    The job
    Which services do you need? *
    What is it about? *
    How would you like us to contact you?
    Drawings and consent

    Fields marked * are required.

    Ergenc

    Thank you, we have received your request.

    We will look at it and get in touch the way you indicated. Want to add something? Just email it to [email protected].

    Industrial service provider for petrochemicals

    Ergenc works as an industrial service provider for petrochemicals in the Rijnmond area: refineries, crackers and downstream units in the Botlek, Europoort, Pernis and on the Maasvlakte. We provide maintenance, piping, construction, mechanical and shutdowns, with crews of ten to thirty craftsmen.

    VCA-Petrochemie as a requirement

    On a petrochemical plant, VCA-Petrochemie is the requirement for being allowed to work there. We also work to ISO 9001, weld to ISO 3834-2 and build steel structures to EN 1090. See also our safety and certificates.

    Within thirty minutes from Hellevoetsluis

    Our workshop is in Hellevoetsluis, half an hour from most sites. That saves travel time in a breakdown and makes tailor made prefab possible. Call us about your plant.

    Skip to content