So the energy keeps flowing.

Power plants, heat networks, LNG and hydrogen. Pipework, heat exchangers and construction for installations that deliver tomorrow's energy.

Scroll and get to know us

What it is about

The energy world is changing faster than its installations. We build and maintain both.

In the power plant

Four spots where we are at work.

Scroll and the points light up one by one.

Heat exchangers

Covers off, bundle out, gaskets in.

Pulling, replacing gaskets, tightening to procedure and pressure testing. Then closed up again and tested.

Pipework

Steam, cooling water and heat network.

Pipework in carbon steel and stainless steel, from a small modification to a complete route, with the inspection included.

Cryogenic and hydrogen

Different material, different procedure.

Cryogenic piping for LNG and high-pressure lines for hydrogen call for different materials and different welding procedures.

Construction

Platforms and supports.

Steel that can take the load of pipes, insulation and wind, calculated and with CE marking.

What we do there

From heat network to hydrogen line.

Scroll through the list, the image moves along.

Heat exchangersPulling the bundle, replacing gaskets, tightening and pressure testing. Steam linesHigh temperature and expansion: clamps and supports calculated for movement. Cryogenic pipingLNG calls for material that can handle the cold and for welders who are qualified for it. Hydrogen linesHigh pressure, tight tolerances and a file in which everything can be traced. Pumps and fansDismantling, putting back and aligning, with vibration measurement at start-up. ConstructionPlatforms, stairs and pipe racks to EN 1090.

From power plant to hydrogen.

The installations change, the trade does not. Tight pipes, steel that stands and a file that adds up matter just as much for a coal-fired power plant as for an electrolyser.

Frequently asked questions

Questions about working in the energy sector.

Do you have experience with hydrogen?

We install high-pressure lines and weld to the procedures that go with them. For the specific inspection we work with regular partners.

Do you also do cryogenic work for LNG?

Yes, with material and welding procedures qualified for low temperatures.

Can you work during a planned outage at a power plant?

Yes, in shifts if needed, with the same people before, during and after the stop.

Working in the energy sector

Tell us about your installation in the energy sector.

Tell us which installation it is about and what needs to be done. We will tell you whether it suits us and when we can do it.

  • We read your requestTogether with the details and drawings you send along, so we know what it is about.
  • We get in touchThe way you prefer, by email or by phone, with the questions that matter.
  • Where needed, we come and take a lookOn site we see more than on a drawing. After that you get a proposal with price and planning.

Rather speak to someone right away? Call +31 181 284042 or email [email protected].

    About you
    Your company
    The job
    Which services do you need? *
    What is it about? *
    How would you like us to contact you?
    Drawings and consent

    Fields marked * are required.

    Ergenc

    Thank you, we have received your request.

    We will look at it and get in touch the way you indicated. Want to add something? Just email it to [email protected].

    Industrial service provider for the energy sector

    Ergenc works for the energy sector in the Rijnmond area: power plants, heat networks, LNG terminals and installations for the energy transition. We deliver pipework, mechanical, construction and shutdowns, from heat exchanger to hydrogen line.

    Cryogenic piping and hydrogen

    LNG and hydrogen call for different material and different welding procedures. Our welders are qualified per process to ISO 3834-2 and we work to ISO 9001. Also read about quality and our CSR policy.

    Working sustainably in the energy sector

    We believe in a sustainable future: one hundred percent green electricity, no gas in the workshop and offsetting through reforestation. Working safely to VCA-Petrochemie is part of that. Call us about your installation.

    Skip to content