A new building, a new future.

Twenty years ago this company started with a borrowed welding machine. In the spring of 2027 we will have a building of our own on the Hopperweg in Hellevoetsluis. A spacious hall, separate storage for stainless steel and our own workshop. Built to get your work out the door faster.

Scroll and get to know us

One address

More room to build in, more facilities under one roof and more technology to move your work forward.

Turn it around

The building, from every side.

Turn it around, click through the viewpoints and switch on the evening. Almost fifty metres long and three storeys high, on our own plot with room all around for lorries. Switch on the evening and you see how it will look when the last shift goes home.

Viewpoint
Live 3D Drag to rotate · ctrl or cmd with scroll to zoom
Design and impressionsBrand BBA ArchitectenContractorBWS Bouw

One address

Everything your project needs.

A hall that takes larger structures, separate storage for your stainless steel, our own workshop and an office ten steps away. Ready for whatever industry asks of us over the next twenty years.

Production hall

Welding, assembly and construction under one roof.

A spacious hall with our own lifting gear, so spools, frames and platforms are made indoors instead of on a scaffold in the wind.

Office

Work preparation next to the shop floor.

Estimating and work preparation sit ten steps from the shop floor. Short lines, for you too.

Storage

Stainless steel apart from carbon steel.

Stainless steel gets its own space, neatly separated from carbon steel. That keeps the material clean and the inspection smooth.

Roof

Solar panels and a battery.

The whole roof catches the sun, and what we do not use straight away goes into the battery.

Three storeys

The building rises, storey by storey.

Scroll and see what goes where. The figures below move along.

Ground floor

Production hall with lifting gear.

Almost fifty metres long, high enough to make spools and frames indoors instead of on a scaffold.

First floor

Workshop and storage.

Sawing, drilling and coating on one floor, with stainless steel stored apart from carbon steel.

Second floor

Office and roof terrace.

Estimating and work preparation above the hall, with a roof terrace.

1.300square metres under one roof
1.900square metres of our own plot
50metres long, three storeys high
2027the door opens in spring

What goes in

More room, shorter lines.

The building is laid out for flow. From the first drawing to the final inspection your work runs in a straight line through the hall, where the steel comes in, gets welded and leaves inspected.

A hall to build in

Maintenance, construction, piping, mechanical and production under one roof. Machines, welding bays and inspection sit side by side, so one step flows straight into the next.

More prefab, less site work

We prefabricate larger sections here in full. On your installation only assembly is left, and that saves downtime.

Stainless separate from steel

Stainless steel gets its own space, neatly separated from carbon steel. That keeps the material clean and the inspection smooth.

Office next to the floor

Estimating and work preparation sit ten steps from the shop floor. Short lines, for you too.

Corten steel, because steel is what we are.

The office volume gets a corten steel facade, the hall becomes anthracite with a wood look. That rust is not wear, it is a skin. In ten years that facade will look better than on the day it was handed over, and from the outside you see what we do inside.

Impressions: Brand BBA Architecten

Building sustainably

A building that generates its own electricity.

You build a new place only once, so you build it for the next twenty years. A roof full of solar panels, a battery that holds what they produce and green electricity from wind farms for the rest. The hall will run entirely on sun and wind, and that is not a side project, it is simply how we want to work.

Our energy mix from 2027sun + wind = 100%
Sun from our own roof Wind from wind farms 0% grey power

Solar panels on the roof

The whole roof catches the sun. That power goes straight to the hall, the machines and the charging points on the site.

A battery that thinks along

What we generate during the day and do not use straight away goes into the battery. That way the evening shift works on the sun of that same morning.

The rest comes from wind

What we do not generate ourselves we buy as green electricity from wind farms. No grey power, no offsetting after the fact.

Technology that thinks along

Heating, lighting and ventilation adjust themselves to what is happening in the hall. You do not see it, you notice it on the bill.

Sustainability here is more than the roof. It sits in how we buy material, book leftovers back into stock and train our people. What we do and why is set out in our CSR policy.

Close to where it happens

Half an hour's drive saves a day of downtime.

From the Hopperweg we drive straight into the Botlek, with our own people and our own equipment. That does not save kilometres, it saves hours, and hours are exactly what a stopped installation costs.

Within 30 minutesBotlekEuropoortPernisMaasvlakteMoerdijkRijnmond
For these sectorsOil and gasChemicalsPetrochemicalsStorageWaterEnergyFoodPharmaceuticalsMetal industryShippingEnergy transition
In black and whiteVCA-PISO 9001ISO 3834EN 1090

Our own technology

Engineering is our trade. The rest we automate.

The hall will hold heavy equipment. The tool you benefit from most weighs nothing. Our own ERP takes over the routine: planning, recording, building files. It is quick and accurate, and you watch along live. That keeps our craftsmen's hands free for what they are good at: engineering.

Faster

From request to a substantiated quote. The system calculates with real figures from comparable work, so you know where you stand quickly.

Automatic

The weld log, certificates and reporting come into being while we work. Your file grows along and is finished on the day of handover.

Transparent

Progress, inspections, hours and material are live in your own overview. You see how far along we are yourself, whenever you like.

Innovative

We build it ourselves. If a fitter on the floor thinks of a better way, it is in there a week later. That is the advantage of a system of your own.

The system

This screen runs on the floor. You watch along.

Everything that is going on sits in one view: which projects are running, where it pinches, who is on it and what was recorded today. The fitter sees it on a tablet, work preparation at the office, you in your own overview. One truth, at the same moment.

ergenc erp · shop floorlive
Running projectsupdated 09:41
Spool set E-204 · Botlekon schedule 316L stainless · heat 8841-B · 34 of 50 welds
Heat exchanger overhaul · Moerdijkwaiting for a part Flange DN200 PN16 · delivery 04-09 · planning recalculated
Pipe run phase 2 · Europoorton schedule Isometric IS-204 rev. C · 12 spools prefabricated
Storage tank structure · Pernishanded over File complete · NDT 6 of 6 approved · 22-08

> what has been booked on my project this month?

230 hours this week, 1,640 of the 2,100 budgeted hours in total. Prefab is running ahead of schedule and assembly starts Monday. At this pace you hand over in week 38.

source: time registration and planning · 0,4 s · with substantiation

Your project this weekwk 36
Hours230 this week · 12 craftsmen
Total1,640 of 2,100 budgeted
Progress34 of 50 welds · 68%
Budget68% used · running level
DeliveryWeek 38 · on schedule
Extra work1 notification · awaiting your approval
File82% complete · growing along
Where the hours went
Prefab in the workshop96 u
Assembly on site74 u
Welding and inspection42 u
Work preparation18 u
This week on the planningwk 36
Mon 01-09 · Prefab spool set E-204workshop 4 craftsmen · 8 spools planned · material ready
Tue 02-09 · Assembly Europoorton site 6 craftsmen · work permit arranged · crane reserved
Wed 03-09 · Overhaul Moerdijkwaiting for a part Flange DN200 arrives 04-09 · crew moves to Thursday
Thu 04-09 · Inspection and handoverplanned NDT scheduled · file is compiled automatically
What that means for you
HandoverWeek 38 · unchanged
Shifts1 day internally · not in your planning
Capacity12 craftsmen this week
Next stepAssembly starts Monday

> is my handover date shifting?

No. The delay at Moerdijk was absorbed within our own margin by bringing prefab forward. Week 38 stands.

source: planning · recalculated 09:41

Hours on your projectwk 36
Prefab in the workshop96 u
Assembly on site74 u
Welding and inspection42 u
Work preparation18 u
Transport and logistics9 u
Against the budget
This week230 hours · 12 craftsmen
Total1,640 of 2,100 budgeted
Used78% of the hours
Complete82% of the work · running ahead
Extra work1 notification · awaiting your approval
InvoicingPer milestone · no surprises
Material on your project
316L stainless · heat 8841-Btraced Certificate 3.1 linked · stored apart from carbon steel
Pipe 168.3 x 7.11 · 42 metresin stock Heat linked to spools E-204-01 through E-204-08
Flange DN200 PN16in transit Delivery 04-09 · supplier confirmed · planning adjusted
Filler materiallinked Batch and certificate fixed to every weld in the log
From heat to weld
Traceable100% of the material
Certificates1 with every heat · in your file
SeparationStainless separate from steel · own storage
RemainderBooked back to stock

> where does the steel in spool E-204-03 come from?

Heat 8841-B, 316L stainless, with certificate 3.1. Used in eight spools, all traceable in your file.

source: material tracing · 0,3 s

Weld bookwriting along
Laid34 of 50 welds · 68%
Method141 TIG · recorded per weld
ProcedureWPS-204 · linked
Today6 welds · recorded at 09:41
Rework0 · no rejects
ReportingGrows along, finished at handover
What you get from it

> how do I know weld 34 is sound?

Every weld is recorded with date, method, procedure and inspection result. It sits complete in your file, and in three years it is still there.

source: weld log · realtime

File82% complete · growing along
Manual workNone · created during the work
Inspection and NDT
NDT rounds 1 through 6approved Report linked to the welds concerned
Visual check spools 09 through 16running Scheduled 03-09 · result goes straight into the file
Pressure test pipe section Aplanned Week 37 · protocol prepared
Where things stand
Rejects0 · right first time
Reports6 of 6 · in your file
NextPressure test week 37
StandardsEN 1090 · ISO 3834
NotificationYou are notified with every result
Your file82% complete
Material certificatesdone
Weld book68%
Inspection reports100%
Drawings and isometricsdone
Handover documents34%
How you receive it
WhenOn the day of handover · not later
ShapeDigital, searchable
RetentionStays with us · in three years too
AccessYou are already watching along

> can I still view last year's file?

Yes. Everything from earlier projects is still there, with the same structure and the same certificates underneath.

source: document management

Ask your questionanswer with source

> what did you do for us last year?

Four projects: an overhaul in March, two spool sets over the summer and a structure in November. Together 3,180 hours, all files complete.

source: project history · 0,3 s

> what does a comparable pipe run cost?

Calculated on three comparable projects from the past two years. Substantiated with real hours and real material use.

source: estimating · with comparison

Why this works
SourceOur own files · always included
HistoryTwenty years searchable
SpeedAn answer in a second
OversightA craftsman checks it · always
PrivacyYour project stays yours
This is an impression, our own system does more.

The system plans on qualification, so the right craftsman ends up on the right job by itself. If a delivery gets stuck, the planning recalculates itself and you see it before it becomes your downtime. And every hour, every weld and every certificate lands in your file on its own.

You ask somethingMail, phone or portal. From the first sentence it is recorded and belongs to your project.
You get a priceCalculated on what comparable work actually cost. Substantiated, so you can form your own view.
We prepareDrawings, isometrics and weld lists hang on your project. Everything is ready on the day itself.
We planPeople, qualifications, material and machines in one view. You hear straight away if something shifts.
We workOne tablet on the floor with tasks, drawing and safety instruction. With gloves on, and without coverage too.
We inspectEvery weld with who, what and which method. NDT included. The weld log writes itself while we work.
You get your fileComplete, on the day of handover. And in three years it is still exactly there.

Every weld has a name, a date and a certificate. Yours too.

The AI in our ERP

Just ask.

What did we do for this client last year? Which craftsmen are cleared to weld stainless? Which inspections are on next month's planning? You get an answer from our own files, with the source included. Twenty years of experience, searchable in a second, so the knowledge of the company is always within reach.

That is done by the system

Planning on qualification and availability · tracing material back to the heat · keeping the weld log · watching certificates and inspections · compiling reports · preserving the history of your installation.

That is done by our craftsmen

Welding, fitting and measuring · solving problems no manual covers · thinking along towards a better solution · keeping your installation running · delivering work you can build on.

We work with our hands. And the system keeps track.

What you notice

Better service, without the fuss.

Switching faster

Maintenance, construction and piping come from one hand. We plan, we arrange, you keep your installation running. Minimise downtime, maximise productivity.

More prefab under our own roof

A spacious hall with our own lifting gear. We prefabricate larger spools and structures, so that only assembly is left on site. Every hour we spend here is an hour your installation is not standing still.

Stainless and steel separated

Stainless steel has its own storage, neatly separated from carbon steel. That keeps the material clean and the inspection smooth. We work safely or we do not work.

Good to know

What you notice of the move.

Are you staying in Hellevoetsluis?

Yes. The new building is on the Hopperweg, a few minutes from where we are now. Nothing changes for you.

Does anything change on my project?

No. The same people, the same agreements, the same contact. We plan the move around the work, not the other way round.

Does the travel time stay the same?

Botlek, Europoort, Pernis, Maasvlakte and Moerdijk stay within thirty minutes.

Where will I be sitting down with you?

On the second floor, next to estimating and work preparation. Short lines, literally.

Construction progress

The permit is in place. Ground will be broken soon.

The design is final, the permit is in place and construction starts soon. From that moment you can follow it here step by step, from the first machine on the site to the day the doors open.

Status: permit in place, ground will be broken soon
DesignFinal, December 2025
PermitIn place
Construction startsSoon
Steel and facadeThe building goes up
KeysSpring 2027
live soon
Follow the build from here

As soon as the first machine drives onto the site, this panel comes to life. Images from the plot, the state of the steel and the date the doors open. You do not have to do anything, just come back.

siteHopperweg 3first imageat start of constructionkeysspring 2027
ClientErgencArchitectBrand BBA ArchitectenContractorBWS Bouw

Drop by, spring 2027

The coffee is ready.

You are always welcome, in our current building and in the new one. Tell us about your project, the coffee is ready.

Ravenseweg 13-F in Hellevoetsluis · within 30 minutes in Botlek, Europoort, Maasvlakte and Moerdijk

Working from Hellevoetsluis

Shall we plan your work in now?

The new building on the Hopperweg is under construction; until then we work from the Ravenseweg. Tell us about your project and we will see where and when we make it.

  • We read your requestWith the details and drawings you send, so we know what it is about.
  • We get in touchThe way you prefer, by email or by phone, with the questions that matter.
  • Where needed, we come and lookOn site we see more than on a drawing. After that you receive a proposal with price and planning.

Rather talk to someone straight away? Call +31 181 284042 or email [email protected].

    About you
    Your company
    The job
    Which services do you need? *
    What is it about? *
    How would you like us to contact you?
    Drawings and consent

    Fields marked * are required.

    Ergenc

    Thank you, we have received your request.

    We will look at it and get in touch the way you indicated. Want to add something? Just email it to [email protected].

    New business premises on the Hopperweg in Hellevoetsluis

    Ergenc is building new business premises at Hopperweg 3 in Hellevoetsluis: over 1,300 square metres under one roof on our own plot of nearly 1,900 square metres, with a spacious production hall, our own lifting gear, separate storage for stainless steel and an office next to the shop floor. More room for prefabrication means shorter assembly at our customers' sites.

    Corten steel, sun and wind

    The office volume gets a corten steel facade, the hall will be anthracite with a wood look. Solar panels with a battery go on the roof, and the rest of the electricity comes from wind farms. Read more about our CSR policy.

    Our own technology and handover in spring 2027

    Our own ERP plans by qualification and builds the file while we work. The design is final and the permit is in place; from the first pile we track construction progress on this page. Until then you will find us at Ravenseweg 13-F.